必赢棋牌下载_必赢棋牌官方下载_必赢棋牌安卓版

当前位置: 精品工程 > 投资工程
最新消息

贵阳至瓮安高速必赢棋牌官方下载BOT项目

发布时间:2018-11-09 08:49:45 来源: 分享到:

贵州贵阳至瓮安高速必赢棋牌官方下载全长71.016公里,项目总投资为94.88亿元,采用BOT+EPC+建设期补贴方式投资建设,建设期2.5年,于2015年12月建成通车,运营期30年。必赢棋牌下载充分发挥投资、建设、设计、施工一体化优势,创造的贵瓮模式成为国家发改委、国资委、财政部及行业专家研究的“PPP样本”。

Guizhou Guiyang-Weng'an Expressway is 71.016km long, with the total investment amount of 9.488 billion yuan; it is built by using BOT + EPC + subsidies during construction period, with 2.5 years of construction period; it is opened to traffic in December 2015, with 30 years of operation period. CCCC Second Highway Engineering Co., Ltd. gives fully play to integrated advantage of investment, construction, design and construction, and Guizhou-Weng'an mode has become "PPP sample" model for the State Development and Reform Commission, State Administration and Administration Commission, Ministry of Finance and the industry experts.

地址:西安市科技六路33号 邮编:(710065) 电话:+86-029-89560113 电子邮箱:zjegj@shbcccc.com
Copyright?2012必赢棋牌安卓版第二必赢棋牌官方下载局有限企业 版权所有All Rights Reserved
网站维护:信息化管理部 网站技术支撑:必赢棋牌下载 陕ICP备08105335号

  • 手机版网站
  • 微信公众号
XML 地图 | Sitemap 地图